USS Achernar (AKA-53)

From Citizendium
Jump to navigation Jump to search
This article is developed but not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable, developed Main Article is subject to a disclaimer.
USS Achernar (AKA-53) USS Achernar (AKA-53)
History
Laid down: 6 September 1943
Launched: 3 December 1943
Commissioned: 31 January 1944
Decommissioned: 1 July 1963
Struck: Unknown
Fate: Transferred to Spain
General Characteristics
Displacement: 14,200 tons
Length: 459 ft 2 in (140 m)
Beam: 63 ft (19 m)
Draft: 26 ft 4 in (8 m)
Speed: 16.5 knots (31 km/h)
Complement: 429
Armament: 1 5", 8 40 mm, and 18 20 mm guns

USS Achernar (AKA-53) was an Andromeda-class attack cargo ship named after the star Achernar. She served as a commissioned ship for 19 years and 5 months, receiving three battle stars for World War II service and three battle stars for Korean War service.

1943-1944

Achernar was laid down under a Maritime Commission contract on 6 September 1943 at Kearney, New Jersey by Federal Shipbuilding and Drydock Co., launched on 3 December 1943, sponsored by Mrs. Adela Rogers St. John, acquired by the Navy on 29 January 1944, and commissioned on 31 January 1944 with Commander H. R. Stevens in command.

Following conversion and fitting out at the New York Navy Yard, the attack cargo ship got underway on 28 February and held shakedown in the Chesapeake Bay. On 13 March, she arrived at Staten Island, New York — where she loaded cargo and embarked Army personnel for transportation to Britain — and stood out to sea on 19 March, with Convoy CU-18. She arrived at Swansea, Wales on 30 March and spent the next two months transporting cargo and personnel between various ports in the United Kingdom in preparation for the Normandy invasion.

The last week in May found Achernar in Plymouth, England. On 1 June, she was designated the 1st Army's headquarters ship. On 6 June, she steamed across the English Channel and anchored in her preassigned position in Baie de la Seine, France. For the next few days, she acted as a nerve center for troops fighting for a foothold in France. A great deal of secrecy surrounded this duty, and the ship's name was deceptively reported to the public as USS Acamar. Confusion about the name remained for over 60 years.[1]

On 11 June, the 1st Army's headquarters disembarked; and Achernar got underway for England. After a three-day respite in Plymouth, the ship moved to Roseneath, Scotland to take on the cargo and personnel of two construction battalions. On 19 June, she returned to Plymouth to onload materials to repair damaged assault craft and, on 22 June, got underway for the assault area in France. While on station, she underwent several enemy air attacks. The cargo ship again left the French coast on 29 June to return to England and arrived in Plymouth on 1 July. On 5 July, the ship was ordered to sail as a part of Task Group (TG) 120.6, which was bound for the Mediterranean Sea to support the invasion of southern France. The ship entered the harbor at Oran, Algeria on 10 July; but, six days later, sailed to Naples, Italy. After loading operations there, she switched to an anchorage at Castellamare, Italy on 2 August. Here, she embarked personnel of the 36th Division and proceeded to sea on the 13th for the assault in southern France. On the morning of 15 August, her crew commenced discharging her cargo and sending it to the beaches. The next day, after finishing the delivery of cargo, she received casualties on board and embarked 13 German prisoners of war before getting underway to return to Naples.

For the next two months, Achernar continued making trips from Naples and Oran to points along the southern coast of France. On 25 October, she sailed from Oran westward through the Strait of Gibraltar towards the United States. She arrived at Hampton Roads on 8 November and underwent repairs and overhaul at the Norfolk Navy Yard. On 7 December, Achernar got underway for a brief period of trials and exercises in Chesapeake Bay. The ship returned to Norfolk on 11 December, took on cargo, and got underway on 18 December. She transited the Panama Canal on Christmas Day 1944.

1945

Achernar arrived at Pearl Harbor on 10 January 1945. Following tactical maneuvers off Oahu from 17 January to 19 January, the cargo ship began loading cargo on 12 February and put to sea on 18 February. Achernar stopped at Eniwetok on 26 February, Kossol Roads on 4 March, and anchored in San Pedro Bay, Philippine Islands, from 15 March to 20 March, before arriving off Okinawa on 1 April to support the seizure of that key island. At 0043 the next day, a Japanese suicide plane hit the attack cargo ship's starboard side; and, almost simultaneously, a bomb exploded on her port side. Fires broke out, and the ship began listing slightly to port. Achernar lost five crew members killed and 41 injured.

By 0100, the fires were out and the list had been corrected. At 1525, the battered ship transferred her casualties to USS Solace and proceeded to anchor off Hagushi beach, where temporary repairs began. On the morning of 3 April, Achernar moved to Kerama Retto to begin unloading her cargo. She remained at Okinawa until 19 April, when she sailed for the United States via Ulithi and Pearl Harbor. The vessel arrived at San Francisco, California on 13 May and began offloading ammunition and fuel. Two days later, she entered drydock for repairs and overhaul. She got underway again on 10 July for shakedown along the California coast. On 4 August, Achernar left San Francisco to return to Pearl Harbor, where she arrived a week later and immediately began discharging her cargo. She was still in Hawaii (U.S. state) when hostilities ended on 15 August. Achernar then shuttled personnel and equipment between Japan, various other Pacific islands, and took part in "Magic Carpet" operations, returning veterans to the United States.

On 28 November, Achernar arrived in Seattle, Washington. One week later, S.S. H. H. Raymond collided with her during a storm. As a result of the damage she sustained in the accident, Achernar entered dry dock on 22 December for repairs.

1946

Achernar got underway again on 16 January 1946 and resumed operations between the west coast and various ports in the Far East and the Pacific. When the Military Sea Transportation Service was formed on 1 October 1949, she was one of a group of attack cargo ships selected for service in the new organization. At the outbreak of the Korean War, Achernar was completing overhaul at the Hunters Point Naval Shipyard. She got underway on 7 July 1950 and soon began onloading troops and cargo for transportation to the war zone. On 14 July, the ship joined TG 53.7 and sailed for Japan. She unloaded her cargo at Kobe, Sasebo, and Yokosuka. On 22 September, she left Japan and proceeded to Inchon, Korea, to support nearby ground operations.

After American forces had liberated the territory near Inchon and Seoul, elements of the 1st Marine Division and their equipment were loaded on board Achernar for landing on the east coast of Korea at Wonsan. She sailed as part of TG 90.2 and arrived in Wonsan on 25 October. She unloaded her passengers and proceeded to Moji, Japan, arriving there on 31 October. There, she took on men of the 2nd Infantry Division for transportation to Wonsan. Following this mission, she returned to Yokosuka on 20 November.

The attack cargo ship was then ordered to report back to the United States. She left Japan on 27 November accompanying USS Brush and USS Mansfield — both of which had been damaged by naval mines — ready to assist them, if necessary. They made brief stops at Midway and Pearl Harbor before reaching San Francisco on 17 December.

1950s

Following a short availability period, Achernar went to Port Hueneme, California on 18 January 1951 to onload cargo and personnel for transportation to the Aleutians. After unloading at Amchitka, she visited Adak, Whittier, Alaska, and Kodiak Island to pick up cargo to be returned to Seattle. On 17 March, Achernar set course for Norfolk. She transited the Panama Canal on 26 March; paused at Morehead City, North Carolina on 1 April; and finally arrived at Norfolk on 3 April. The ship was assigned to the Amphibious Force, Atlantic Fleet, and took part in various fleet exercises and cargo runs in the Caribbean and along the east coast. On 18 February 1956, Achernar was decommissioned; placed in reserve; and berthed at Orange, Texas.

1960s onward

Achernar was placed back in commission at New Orleans, Louisiana on 1 September 1961. She arrived at Norfolk on 1 December 1961 and became a unit of Amphibious Squadron 6, Atlantic Fleet. Achernar held shakedown in the Caribbean and spent the remainder of her career conducting various training exercises in the Virginia capes operating area.

Achernar was placed out of commission on 1 July 1963 and transferred to the Maritime Administration. She was reacquired by the Navy on 29 January 1964 but saw no active service before she was transferred to the government of Spain on 2 February 1965. She served the Spanish Navy as Castilla (TA-21) until scrapped in 1982.

External links

References