USS Devosa (AKA-27)

From Citizendium
Jump to navigation Jump to search
This article is developed but not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable, developed Main Article is subject to a disclaimer.
USSDevosa2.jpg USS Devosa (AKA-27)
History
Laid down: Unknown
Launched: 12 October 1944
Commissioned: 30 November 1944
Decommissioned: 2 April 1946
Struck: Unknown
Fate: Unknown
General Characteristics
Builder: Walsh-Kaiser Co., Inc.
Hull type: S4-SE2-BE1
Displacement: 4,087 tons light, 7,080 tons loaded
Length: 426 ft (129.8 m)
Beam: 58 ft (17.7 m)
Draft: 16 ft (4.9 m)
Propulsion: Steam turbo-electric drive; two boilers, two propellers,
6,000 shp (4.5 MW)
Speed: 16.9 knots (31.3 km/h)
Complement: 321 (20 officers, 301 men), plus 255 embarked troops
Armament: 1 × 5"/38 caliber DP gun,
4 × twin 40 mm AA guns,
16 × 20 mm AA guns
Boats: 14 LCVP,
8 LCM

USS Devosa (AKA-27) was an Artemis class attack cargo ship named after the asteroid 337 Devosa. The origin of the name is not known. USS Devosa served as a commissioned ship for 16 months, and received one battle star for World War II service.

History

Devosa (AKA-27) was launched 12 October 1944 by Walsh-Kaiser Co., Inc., Providence, R.I., under a Maritime Commission contract; sponsored by Mrs. A. W. Radford, wife of Rear Admiral Radford; transferred to the Navy 30 November 1944; and commissioned the same day, Lieutenant Commander R. C. Wilkinson, USNR, in command.

Devosa sailed from Norfolk 1 January 1945 carrying a cargo of oil drums to Pearl Harbor, arriving 21 January. On 3 February she got underway for Tulagi, Florida Islands, where she discharged 36 landing craft for the boat pool and took part in amphibious training, preparing for the invasion of Okinawa.

Carrying Marines, the Motor Torpedo Boat Squadron 11, a U.S. Military Government unit, and part of a Mobile Naval Hospital unit, Devosa sailed to Ulithi, staging point for the invasion of Okinawa, for which she sailed 27 March. Devosa landed troops and cargo in the initial assault on 1 April and remained off Okinawa until 10 April when she returned to the West Coast, arriving San Francisco, California 18 May.

Returning to the Pacific area Devosa carried naval construction battalion men and equipment from Pearl Harbor to Samar, then sailed to Manus to load antisubmarine net gear for transfer to Iwo Jima. Arriving at Saipan 13 August she carried recovered battle casualties who were returning to their units at Okinawa, arriving 3 September. A week later she got underway for Jinsen, landing troops for the occupation of Korea from 13 September to 15 September. Devosa carried occupation troops from Okinawa to Tientsin, China between 30 September and 9 October, then sailed by way of Manila, Philippine Islands, for Seattle, Wash., arriving 16 November. She carried cargo to Pearl Harbor, returning to San Pedro 25 December. On 21 January 1946 Devosa put out for Norfolk where she arrived 6 February. She was decommissioned at New York 2 April 1946, and transferred to the Maritime Commission for disposal the same day.

References

External links