Revision history of "File:Bathroom floor and tiling.jpg"

Jump to: navigation, search

Diff selection: Mark the radio boxes of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

  • (cur | prev) 02:42, 20 February 2010Thomas Wright Sulcer (Talk | contribs). . (570 bytes) (+570). . ({{Image_Details|user-pd |description = Picture of bathroom tiling |author = ~~~ |date-created = 2009 |pub-country = United States |notes = The old floor was ripped up and removed; all that remained were joists. Plumbers and electricians installed pipes and wires. Next, 3/4 inch plywood went on top, along with compound to smooth out irregularities. Vinyl tiles were added. Replacing tiles is a medium-level handyman project. |versions = }})